Geoffroy Guichard stadium, Saint-Etienne

This project, which complies with UEFA EURO 2016 standards, preserves and enhances the existing structures : 4 right-angled stands, rifts at the corners and historic embankments. It proposes a show configuration with public access through the 4 faults and a new megastructure for scenographic supports. A total reconfiguration of the presidential stand is proposed, with 3 VIP lounges and a terrace facing the pitch, a raised presidential basket and a press level.

Team

Director

Alain Marchal

Project leader

Sandrine Masson

Team

Serge Journot, Laure Perdigon, Leila Belloundja, Corinne Thibaut, Henri Guillaud-Beauregard