Works Imaging, oncology and haematology center of the Brest University Hospital

01.25.2022

Event Archifoot 2025

07.01.2025

ARCHIFOOT 2025

Works Foundation stone laid for the SMR building on the Monod site in Le Havre

06.27.2025

Works Aulnay-sous-Bois Operations Centre’s construction site

06.03.2025

Awards QVCT & Architecture en Santé 2025 Awards

05.21.2025

Conference Groupe-6 architectes @ SantExpo 2025

05.19.2025

Event Foundation stone of Haliotis 2 project, STEP in Nice

05.15.2025

Event Inauguration of the Valence General Hospital’s new technical platform

05.14.2025

Publication Transforming 20th-century healthcare architecture, the book !

05.06.2025

Event BIM World 2025

04.02.2025

Groupe-6 winner Biology and Pathology Platform, Henri-Mondor University Hospital, Créteil

03.19.2025

The construction of the new imaging, oncology and haematology center on the Cavale Blanche site of the Brest University Hospital is in full swing, with a view to opening in 2023! On five levels, including a basement, this institute will occupy 21,000 m2, and will house public and private radiotherapy for the Brest area, nuclear medicine, imaging, oncology and haematology. It favors the connection of the mall and the square with the interior spaces: hall, atrium, landings and urban window, and the steps and steps of the hall contribute to this continuity. The project was managed by the EIFFAGE CONSTRUCTION BRETAGNE group, with Egis Atelier Espinosa, PROGRAY and Clévia.

More details here.