In the exceptional setting of the Baie des Anges in Nice, the renovation of the Nice wastewater treatment plant will enable it to be rebuilt in situ, and to continue to operate during the works. Its landscaping will involve 52% of the whole land area. It will ensure the urban and environment embedding of the site, as well as the formation of a green hilly area, Cap Haliotis, enclosing the industrial site and staggering its plantations from the urban monumental entrance to the coastline.
Christian Estrosi, Mayor of Nice and President of the Nice Côte d’Azur Metropolitan Area, will attend the today’s signing in Nice, of the global performance contract won by the Degrémont France Group, a subsidiary company of Suez. The mass layout shows a cluster of buildings, from the city towards the sea: the façade, overlooking the Promenade des Anglais, perfectly suits the city, keeping to the landscape. Then, a service strip hosts the storage and process areas, and finally, on the seafront, the fully integrated process area.
The plant’s architecture will perfectly suit the town, speckled with green areas, and clad in noble materials (stone, terracotta). Inspired by the Haliotis seashell, the facades colours hues graduation range will span from red ochre, on the urban facade, to white ochre, near the sea. Reminding of the Nice diving board, a lookout point allows a 360° view of the site. From a sustainable point of view, the project is also highly ambitious: the STEP will become a positive-energy plant, combining global energy optimization and energy recovery.










