Conference Come and join Groupe-6 at the “Journées d’Architecture en Santé” in Menton

10.11.2021

Event Archifoot 2025

07.01.2025

ARCHIFOOT 2025

Works Foundation stone laid for the SMR building on the Monod site in Le Havre

06.27.2025

Works Aulnay-sous-Bois Operations Centre’s construction site

06.03.2025

Awards QVCT & Architecture en Santé 2025 Awards

05.21.2025

Conference Groupe-6 architectes @ SantExpo 2025

05.19.2025

Event Foundation stone of Haliotis 2 project, STEP in Nice

05.15.2025

Event Inauguration of the Valence General Hospital’s new technical platform

05.14.2025

Publication Transforming 20th-century healthcare architecture, the book !

05.06.2025

Event BIM World 2025

04.02.2025

Groupe-6 winner Biology and Pathology Platform, Henri-Mondor University Hospital, Créteil

03.19.2025

Come and join Groupe-6 at the “Journées d’Architecture en Santé” in Menton next week ! “L’Hôpital Bas Carbone”, a talk by Geraldine Maurice and Yves Tailfer, Tuesday October 19th at 9:00 AM at the Palais de l’Europe.

Low-carbon design has been gaining ground in French construction for several years now, and the deployment of the new “Stratégie Nationale Bas Carbone” in 2020 is defining its guidelines. But what will it change in the architectural design of healthcare facilities ? Low-carbon projects are rare in the healthcare sector.

What are the reasons of such lack, since the hospital was precisely at the origin of bioclimatic design, as early as the Renaissance, to meet higher hygiene standards ? What are the levers that will enable us to control the hospital’s carbon footprint, considering its high consumption levels, as well as the challenges of performance and upgradability ? Would not low-carbon design be also an opportunity to take into account added-value uses and caregivers and patients’ quality life ? Géraldine Maurice and Yves Tailfer, Project Directors at Groupe-6, will focus on recent examples of healthcare projects, or other programs, to give a clearer picture of the low-carbon challenges in terms of healthcare.

Projects :

Hôpital Grand Paris-Nord, France – competitions;
Hôpital Riviera-Chablais, Vaud-Valais, Rennaz, Suisse – construction;
Hôpital de Reims, France – construction;
IntenCity Schneider Electric – construction.

https://www.ja-sante.fr/%C3%A9v%C3%A9nement/lhopital-bas-carbone/.