Dubai Summit Mock-Up

04.15.2022

Event Archifoot 2025

07.01.2025

ARCHIFOOT 2025

Works Foundation stone laid for the SMR building on the Monod site in Le Havre

06.27.2025

Works Aulnay-sous-Bois Operations Centre’s construction site

06.03.2025

Awards QVCT & Architecture en Santé 2025 Awards

05.21.2025

Conference Groupe-6 architectes @ SantExpo 2025

05.19.2025

Event Foundation stone of Haliotis 2 project, STEP in Nice

05.15.2025

Event Inauguration of the Valence General Hospital’s new technical platform

05.14.2025

Publication Transforming 20th-century healthcare architecture, the book !

05.06.2025

Event BIM World 2025

04.02.2025

Groupe-6 winner Biology and Pathology Platform, Henri-Mondor University Hospital, Créteil

03.19.2025

[2022 PROJECTS] Dubai Summit. Developed in Hatta by DEWA (Dubai Electricity and Water Authority), with EDF Engineering and Groupe-6 architectes, this 5.4km cable transport line will reach the 1,300 m high Al-Nassor peak, the highest point in Dubai, connecting three stations, while reaching the refuge hotel at its summit, with its belvedere platform overlooking the void and the breath-taking, untouched landscape. The project also includes a luxury hotel, nestling in the mountain, as well as a space to put under the spotlight the fauna, flora, and the archaeological heritage of the Hatta National Park.

The planning application will be submitted at the end of 2021, with construction starting in 2022.