Photo IntenCity Schneider Electric’s big staircase

09.02.2021

Event Archifoot 2025

07.01.2025

ARCHIFOOT 2025

Works Foundation stone laid for the SMR building on the Monod site in Le Havre

06.27.2025

Works Aulnay-sous-Bois Operations Centre’s construction site

06.03.2025

Awards QVCT & Architecture en Santé 2025 Awards

05.21.2025

Conference Groupe-6 architectes @ SantExpo 2025

05.19.2025

Event Foundation stone of Haliotis 2 project, STEP in Nice

05.15.2025

Event Inauguration of the Valence General Hospital’s new technical platform

05.14.2025

Publication Transforming 20th-century healthcare architecture, the book !

05.06.2025

Event BIM World 2025

04.02.2025

Groupe-6 winner Biology and Pathology Platform, Henri-Mondor University Hospital, Créteil

03.19.2025

At Schneider Electric IntenCity, to encourage real exchanges, the spaces stick to friendly scales to ensure flow, mobility, as well as different configurations. The big staircase brings people together proving continuity, while resulting into multi-tasking areas where to work, take a break or meet-up. It opens out onto the landscape, as if to allow the climbing of the opposite mountain !

Thanks to Michel Denancé for his pictures.