Photo The Poissy Saint Germain Intercommunal Hospital in pictures

08.26.2021

Event Archifoot 2025

07.01.2025

ARCHIFOOT 2025

Works Foundation stone laid for the SMR building on the Monod site in Le Havre

06.27.2025

Works Aulnay-sous-Bois Operations Centre’s construction site

06.03.2025

Awards QVCT & Architecture en Santé 2025 Awards

05.21.2025

Conference Groupe-6 architectes @ SantExpo 2025

05.19.2025

Event Foundation stone of Haliotis 2 project, STEP in Nice

05.15.2025

Event Inauguration of the Valence General Hospital’s new technical platform

05.14.2025

Publication Transforming 20th-century healthcare architecture, the book !

05.06.2025

Event BIM World 2025

04.02.2025

Groupe-6 winner Biology and Pathology Platform, Henri-Mondor University Hospital, Créteil

03.19.2025

Delivered at the end of 2020, the extension-renovation project, carried out on an occupied site, includes the new hospital’s general reception area, renewing the site into a rational, unitary whole. On the south-facing side, the main entrance, consisting of a brick-clad courtyard and an inner flows area, connects the main hall to the new building, while on the west-facing side, the emergency entrances immediately stand-out. Spanning 19,000 m² over 7 levels, the project will host the different services, such as emergency, intensive care, cardiology, neurology, endoscopy, infectious diseases, maternity and neonatology, AMP and 200 hospital rooms.

Thanks to Paul Hamelin for his pictures!