Publication L’Architecture d’Aujourd’hui, Confiné.e.s : Groupe- 6

04.06.2020

Event Archifoot 2025

07.01.2025

ARCHIFOOT 2025

Works Foundation stone laid for the SMR building on the Monod site in Le Havre

06.27.2025

Works Aulnay-sous-Bois Operations Centre’s construction site

06.03.2025

Awards QVCT & Architecture en Santé 2025 Awards

05.21.2025

Conference Groupe-6 architectes @ SantExpo 2025

05.19.2025

Event Foundation stone of Haliotis 2 project, STEP in Nice

05.15.2025

Event Inauguration of the Valence General Hospital’s new technical platform

05.14.2025

Publication Transforming 20th-century healthcare architecture, the book !

05.06.2025

Event BIM World 2025

04.02.2025

Groupe-6 winner Biology and Pathology Platform, Henri-Mondor University Hospital, Créteil

03.19.2025

Faced with the lockdown to counter the spread of the Covid-19 virus, the architects had to adapt their work practice and methods. The series «Confiné.e.s» of the French review L’ARCHITECTURE D ‘AUJOURD’HUI gives them the floor, questioning their vision of the situation — but also their cultural recommendations.

http://www.larchitecturedaujourdhui.fr/confine-e-s-groupe-6/.