Event Inauguration of the Valence General Hospital’s new technical platform

05.14.2025

Event Archifoot 2025

07.01.2025

ARCHIFOOT 2025

Works Foundation stone laid for the SMR building on the Monod site in Le Havre

06.27.2025

Works Aulnay-sous-Bois Operations Centre’s construction site

06.03.2025

Awards QVCT & Architecture en Santé 2025 Awards

05.21.2025

Conference Groupe-6 architectes @ SantExpo 2025

05.19.2025

Event Foundation stone of Haliotis 2 project, STEP in Nice

05.15.2025

Publication Transforming 20th-century healthcare architecture, the book !

05.06.2025

Event BIM World 2025

04.02.2025

Groupe-6 winner Biology and Pathology Platform, Henri-Mondor University Hospital, Créteil

03.19.2025

Yannick Neuder, the French Minister for Health and Access to Care, attended the opening ceremony of the Valence General Hospital’s new technical platform on Friday 9 May. With over 800 beds and places, it is a major facility serving the needs of the Drôme and part of the Ardèche.

The project involves restructuring and extending the hospital’s technical facilities, which will be linked to the existing buildings. The refurbishment of existing buildings, which is ongoing, will enable the mother and child unit to be enlarged and the gastroenterology consultations and facilities to be grouped together.