The Dubai Summit project, developed in Hatta by DEWA (Dubai Electricity and Water Authority) on which EDF is the Engineer and Groupe-6 the Architec, is composed by a 5.4km long cable-car to reach the Um Al Nesoor mountain peak at an altitude of 1,300 meters, the highest point in Dubai. It will include three cable car stations, a small world-class hotel integrated into the mountain and a visitor’s center to promote the exceptional flora and fauna and archeological features in the Hatta national park. At the top, the cable-car station will host a “refuge” hotel and a sky-bar and viewing platform suspended over the void, linked with the spectacular landscape. The project will shed light on the hydroelectric storage plant constructed by DEWA with the assistance of EDF France, wich will store solar power during the day and release it at night, hence participating to the growing use of renewable energy for the Emirate.
More details here.










