The Grand Paris Express operations centre’s construction site

Works Chantier du Centre d’exploitation du Grand Paris Express

05.11.2021

Event Archifoot 2025

07.01.2025

ARCHIFOOT 2025

Works Foundation stone laid for the SMR building on the Monod site in Le Havre

06.27.2025

Works Aulnay-sous-Bois Operations Centre’s construction site

06.03.2025

Awards QVCT & Architecture en Santé 2025 Awards

05.21.2025

Conference Groupe-6 architectes @ SantExpo 2025

05.19.2025

Event Foundation stone of Haliotis 2 project, STEP in Nice

05.15.2025

Event Inauguration of the Valence General Hospital’s new technical platform

05.14.2025

Publication Transforming 20th-century healthcare architecture, the book !

05.06.2025

Event BIM World 2025

04.02.2025

Groupe-6 winner Biology and Pathology Platform, Henri-Mondor University Hospital, Créteil

03.19.2025

New pictures of the Grand Paris Express operations centre construction site.

The operations and maintenance centre for lines 16 and 17 of the Grand Paris Express is partially located in the former PSA Peugeot Citroën factory (acquired by Société du Grand Paris in 2017) which covers 21 hectares of land, between the municipalities of Aulnay-sous-Bois (Seine-Saint-Denis) and Gonesse (Val d’Oise).

It will host the following facilities:

– a centralised command post (PCC) to coordinate the trains’ traffic and rule the circulation flows of lines 16 and 17;

– the maintenance and storage site (SMR), dedicated to the trains;

– the infrastructure maintenance site (SMI), dedicated to the equipment (tracks, engineering works, etc.).

Pictures by Nicolas Gromond.